Grenoble:Wattmetre: Difference between revisions

From Grid5000
Jump to navigation Jump to search
No edit summary
No edit summary
Line 84: Line 84:
|}
|}


;Additional dahu nodes (same hardware) are installed in the CIMENT (Gricad) infrastructure) but monitored with the same wattmeter system. The CSV output of wattmetre2-log gives (after the OK word) the measures in the following order:
;Additional dahu nodes (same hardware) are installed in the CIMENT (Gricad) infrastructure, but monitored with the same wattmetre system.
The CSV output of wattmetre2-log gives (after the OK word) the measures in the following order:
{|border=1
{|border=1
|-
|-

Revision as of 16:18, 5 March 2019

The electrical power consumption of all nodes in Grenoble is monitored by wattmetre devices from Omegawatt (same as nodes in Lyon).

Up to 50 measurements per second are recorded for all power supply units of all nodes.

For now, only the yeti nodes are supported by the full featured tools described in the Energy consumption monitoring tutorial.

The dahu nodes are more complex in the fact that they are grouped in chassis of 4 nodes, with 2 power supply units per chassis.

The power consumption information for the dahu is for now limited to the CSV files, as described in this section of the tutorial.

For instance, one CSV line of measures is:

c0:00:fc:00:01:3b:00:40:e6:02:3b:09:66:08:c6:08:35:08:03:08:50:08:13:09:ab:09:ff:ff:00:00:00:00:01:00:8a:16:82:16:a5:11:b8:11:1b:17:e1:16:35:13:15:00:f7:16:c4:16:66:13:78:13:1c:19:fc:18:0e:1c:12:1c:00:00:00:00:4a:74:c1:,
00:fc:00:01:3b:00:40:e6:02:3b:09:66:08:c6:08:35:08:03:08:50:08:13:09:ab:09:ff:ff:00:00:00:00:01:00:8a:16:82:16:a5:11:b8:11:1b:17:e1:16:35:13:15:00:f7:16:c4:16:66:13:78:13:1c:19:fc:18:0e:1c:12:1c:00:00:00:00:4a:74:,
1544796940.084479088,
OK,
230.8,210.0,219.3,205.2,200.3,207.8,226.9,241.7,-0.1,0.0,0.0,0.1,563.5,562.7,441.1,443.0,577.6,572.0,480.2,2.1,574.1,569.1,485.0,486.7,627.7,624.6,701.4,701.8,0.0,0.0
Dahu-Yeti.jpg

"OK" means that the measure is good, and is preceded by the time-stamp of the measure. Watt values begin after the OK, with 30 values as follows:

Wattmetre1-log
1 yeti-1 psu 1
2 yeti-1 psu 2
3 yeti-2 psu 1
4 yeti-2 psu 2
5 yeti-3 psu 1
6 yeti-3 psu 2
7 yeti-4 psu 1
8 yeti-4 psu 2
9 0 / unused
10 0 / unused
11 0 / unused
12 0 / unused
13 dahu-[1-4] psu 1
14 dahu-[1-4] psu 2
15 dahu-[5-8] psu 1
16 dahu-[5-8] psu 2
17 dahu-[9-12] psu 1
18 dahu-[9-12] psu 2
19 dahu-[13-16] psu 1
20 dahu-[13-16] psu 2
21 dahu-[17-20] psu 1
22 dahu-[17-20] psu 2
23 dahu-[21-24] psu 1
24 dahu-[21-24] psu 2
25 dahu-[25-28] psu 1
26 dahu-[25-28] psu 2
27 dahu-[29-32] psu 1
28 dahu-[29-32] psu 2
29 0 / unused
30 0 / unused
Additional dahu nodes (same hardware) are installed in the CIMENT (Gricad) infrastructure, but monitored with the same wattmetre system.

The CSV output of wattmetre2-log gives (after the OK word) the measures in the following order:

Wattmetre2-log
1 dahu[33-36] psu 1
2 dahu[33-36] psu 2
3 dahu[37-40] psu 1
4 dahu[37-40] psu 2
5 dahu[41-44] psu 1
6 dahu[41-44] psu 2
7 dahu[45-48] psu 1
8 dahu[45-48] psu 2
9 dahu[49-52] psu 1
10 dahu[49-52] psu 2
11 dahu[53-56] psu 1
12 dahu[53-56] psu 2
13 dahu[57-60] psu 1
14 dahu[57-60] psu 2
15 dahu[61-64] psu 1
16 dahu[61-64] psu 2
17 dahu[65-68] psu 1
18 dahu[65-68] psu 2
19 dahu[69-72] psu 1
20 dahu-[69-72] psu 2
21 dahu-[73-76] psu 1
22 dahu-[73-76] psu 2
23 dahu-[76-80] psu 1
24 dahu-[76-80] psu 2
25 bigfoot1 psu 1
26 bigfoot1 psu 2
27 bigfoot2 psu 1
28 bigfoot2 psu 2
29 bigfoot3 psu 1
30 bigfoot3 psu 2
  • The CIMENT nodes have to be reserved and managed in the CIMENT (Gricad) infrastructure, with the CIMENT tools (https://gricad.univ-grenoble-alpes.fr/thematiques/calcul-intensif-ciment), but measures are to be retrieved in Grid'5000 (like for Grid'5000 nodes).
  • For experiments involving both the Grid'5000 machines and the CIMENT machines, please contact the staff (support-staff@lists.grid5000.fr).