Grenoble:Wattmetre: Difference between revisions

From Grid5000
Jump to navigation Jump to search
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Portal|User}}
{{Portal|User}}
; The electrical power consumption of all nodes in Grenoble is monitored by wattmetre devices from [http://www.omegawatt.fr/ Omegawatt] (same as nodes in [[Lyon:Wattmetre|Lyon]] or [[Nancy:Wattmetre|Nancy]]).
; The electrical power consumption of the yeti, troll, and servan clusters in Grenoble is measured by wattmetre devices from [http://www.omegawatt.fr/ Omegawatt] (same as nodes in [[Lyon:Wattmetre|Lyon]] or [[Nancy:Wattmetre|Nancy]]).


Up to 50 measurements per second are recorded for all power supply units of all nodes.
* 50 measurements per second are recorded for every power supply unit of those clusters' nodes.
* Each troll node has a single power supply unit (PSU)
* Each yeti node and each servan node have redundant power supply units.
* yeti and troll are monitored by the device named wattmetre-1, servan is measured by the device named wattmetre-2.


For now, '''only the yeti and troll nodes''' are supported by the full featured tools described in the [[Energy consumption monitoring tutorial]], not the dahu nodes.
{{Note|text=Until 2022-09-01, the power consumption of the dahu cluster was also measured, although not available in kwollect (because measured by groups of 4 nodes). Dahu nodes aren't measured anymore due to hardware issues with the wattmetres (see the former version of this page for more information on the dahu measures).}}
 
== Dahu row measures ==
Each troll node has a single power supply unit (PSU) and each yeti node has redondant power supply units.
 
But the '''dahu nodes are more complex''' in the fact that they are grouped in chassis of 4 nodes, with 2 power supply units per chassis.
 
As a consequence, '''the power consumption information for the dahu nodes is limited to the CSV files''', as described in [[Energy_consumption_monitoring_tutorial#On_Lyon_site_and_Grenoble.27s_yeti_cluster|this section of the tutorial]].
 
The row files of measures are located here: http://wattmetre.grenoble.grid5000.fr/data/ (only accessible from within the Grid'5000 network, or using Grid'5000 VPN).
 
For instance, one CSV line of measures is:
c0:00:fc:00:01:3b:00:40:e6:02:3b:09:66:08:c6:08:35:08:03:08:50:08:13:09:ab:09:ff:ff:00:00:00:00:01:00:8a:16:82:16:a5:11:b8:11:1b:17:e1:16:35:13:15:00:f7:16:c4:16:66:13:78:13:1c:19:fc:18:0e:1c:12:1c:00:00:00:00:4a:74:c1:,
00:fc:00:01:3b:00:40:e6:02:3b:09:66:08:c6:08:35:08:03:08:50:08:13:09:ab:09:ff:ff:00:00:00:00:01:00:8a:16:82:16:a5:11:b8:11:1b:17:e1:16:35:13:15:00:f7:16:c4:16:66:13:78:13:1c:19:fc:18:0e:1c:12:1c:00:00:00:00:4a:74:,
1544796940.084479088,
OK,
230.8,210.0,219.3,205.2,200.3,207.8,226.9,241.7,-0.1,0.0,0.0,0.1,563.5,562.7,441.1,443.0,577.6,572.0,480.2,2.1,574.1,569.1,485.0,486.7,627.7,624.6,701.4,701.8,0.0,0.0
 
[[File:Dahu-Troll-Yeti.jpg|400px|right]]
''"OK"'' means that the measure is good, and is preceded by the time-stamp of the measure.
Watt values begin after the ''OK'', with 30 values as follows:
{|border=1
|-
|colspan=2| Wattmetre1-log
|-
| 1 || yeti-1 psu 1
|-
| 2 || yeti-1 psu 2
|-
| 3 || yeti-2 psu 1
|-
| 4 || yeti-2 psu 2
|-
| 5 || yeti-3 psu 1
|-
| 6 || yeti-3 psu 2
|-
| 7 || yeti-4 psu 1
|-
| 8 || yeti-4 psu 2
|-
| 9 || troll-1 psu
|-
| 10 || troll-2 psu
|-
| 11 || troll-3 psu
|-
| 12 || troll-4 psu
|-
| 13 || dahu-[1-4] psu 1
|-
| 14 || dahu-[1-4] psu 2
|-
| 15 || dahu-[5-8] psu 1
|-
| 16 || dahu-[5-8] psu 2
|-
| 17 || dahu-[9-12] psu 1
|-
| 18 || dahu-[9-12] psu 2
|-
| 19 || dahu-[13-16] psu 1
|-
| 20 || dahu-[13-16] psu 2
|-
| 21 || dahu-[17-20] psu 1
|-
| 22 || dahu-[17-20] psu 2
|-
| 23 || dahu-[21-24] psu 1
|-
| 24 || dahu-[21-24] psu 2
|-
| 25 || dahu-[25-28] psu 1
|-
| 26 || dahu-[25-28] psu 2
|-
| 27 || dahu-[29-32] psu 1
|-
| 28 || dahu-[29-32] psu 2
|-
| 29 || 0 / unused
|-
| 30 || 0 / unused
|}
{{Warning|text=We encounter issues with the wattmetre system. Values for the Dahu nodes especially may be missing in the output lines. Error lines may show.}}

Latest revision as of 15:02, 7 September 2022

The electrical power consumption of the yeti, troll, and servan clusters in Grenoble is measured by wattmetre devices from Omegawatt (same as nodes in Lyon or Nancy).
  • 50 measurements per second are recorded for every power supply unit of those clusters' nodes.
  • Each troll node has a single power supply unit (PSU)
  • Each yeti node and each servan node have redundant power supply units.
  • yeti and troll are monitored by the device named wattmetre-1, servan is measured by the device named wattmetre-2.
Note.png Note

Until 2022-09-01, the power consumption of the dahu cluster was also measured, although not available in kwollect (because measured by groups of 4 nodes). Dahu nodes aren't measured anymore due to hardware issues with the wattmetres (see the former version of this page for more information on the dahu measures).